1. drees
  2. RO CSVI
  3. Monday, 12 September 2016
  4.  Subscribe via email
I sent an email to Roland. 'd Just read and reply please. I'm stuck and stressed.
Accepted Answer Pending Moderation
Nice that you have attention to the problem.
I 'am 10 days continue trying. :sick: :angry:
Where the import always get the first picture. That's not good. Two node's appear the same. There need a another argument for it. But that fails me.
Appendix an excel file a xlm a single product. Problem starts at line 205 to 259. The CSVI Analyzer does not have sufficient rules. Also, an annex of the templates. Template Onix new copy that I use. Annex onyx to csv. in Excel format, the first line indicates all node. I think .
I appreciate you special help. I send you a big cake if it succeeds. B)
Attachments (3)
  1. more than a month ago
  2. RO CSVI
  3. # 1
Accepted Answer Pending Moderation
I suddenly saw the light. I did it. See Appendix. :woohoo:
Thank you very much.
Attachments (1)
  1. more than a month ago
  2. RO CSVI
  3. # 2
Accepted Answer Pending Moderation
Good thinking, you are trying to add the value in file_url field with the upcoming ResourceLink nodes. Just a small correction, multiple images are identified with symbol | so your combine character should be | and not /.
Kind regards,

Tharuna

=========================
If you use our extensions, please post a rating and a review at the Joomla! Extension Directory
  1. more than a month ago
  2. RO CSVI
  3. # 3
  • Page :
  • 1


There are no replies made for this post yet.
Be one of the first to reply to this post!